Thursday, November 8, 2018

RESUMEN DOCUMENTOS

CARTA DE PETICIóN

  • Major Family tourist destination
  • Europes´s finest worl-class major tourist integrated resort
  • 200 Ha Technical & Financial Park Integrated
  • 263 Ha world.class major tourist integrated resort
  • Conceptual master planning of the site
  • 30 November 2018 - hard copy version - A3 size

ATTACHMENT 2
  • Spain: history, cuisine, wine, art, architecture, traditions, passionate people, Flamenco, spanish guitars, sunflowers, water fountains, Picasso, Goya, Dali, Cathedrals, castles, bull fights, matadors, Don Quixote, plains, Moors, Greeks, Celts, Visigoths, Roman aqueducts, Phoenician merchants, roman structures
  • 2.000 technological companies actually on the area
Goal
  • Iconic Project
  • Thinking outside the box
  • Integrated zones between tech/finance areas and world class leisure tourist destination
  • Meld elements of Spanish culture and history with contemporary engineered sustainable and very green innovative technological solutions
  • combine the most successfull tourist destinations of the world into one location
  • Have somthing for everyone and memories for a lifetime together with a technological/financial park creating a well integrated fun environment.
  • Sustainable and green design solutions
  • practical, dinamic and iconic solution
  • making the project a "wow" and each destination a "stop" and photo "spot"
Characteristics
  • the site has three legas water wells, considered later in final design
  • water treatment faility, collect all waste
  • 3 possible access
  • Two major airports serve the location, Malaga (106 km) Gibraltar (34 km)
  • Aparently linked to the rail system in Spain in the future
  • The soil is workable and not very rocky (typical Spanish scrub brush, small trees, however there are a few groves of a protected pines - replanted, perhaps at an artificial wave pool area)
  • Assume that the airport will be on site (small 2.7 km airport runway). Maybe will be located on governamental lands
  • Design shoul be engineered to withstand high winds and changin climate
  • Water collection and runoff via mountains and new developments will be extremely important
  • All facilities will have to be able to operate independently, separate substations as well as pump stations for well water and waste/water treatment facilities
Deliverables
  • Masterplan color-coded series of planned layouts with zoning for each component of the complex showing all potential final planning or specialty elements in as much detail as possible
  • 2 perspectives of the entire Project (select a process to show what and why your firm´s design and vision is the right one for this one of a kind project
Creating the understanding of what should and could be for this region of Spain and the stablishment of an iconic touristic and innovative technological development

No comments:

Post a Comment